Birds Directive compliance · Directive 2009/147/EC

Your Birds Directive obligations measured site by site, and translated into an action plan.

10 themes, a 5-level scale. And the action that moves each level to the next.

The framework’s 10 themes, already written from L1 to L5. One company, one business unit, or 300 at once.

Birds Directive compliance · Directive 2009/147/EC

Knowledge of the framework and species concernedN1 → N5
Site status with regard to special protection areasN1 → N5
Surveys and baseline conditionsN1 → N5
Impact assessmentN1 → N5

10 themes, 5-level scale.

Nordhavn Industries

53 / 100

Knowledge of the framework and species concerned6484
Site status with regard to special protection areas5379
Surveys and baseline conditions6182
Impact assessment3773
IAIndustrialised: your interview notes are enough, the AI fills in the audit.

They measure their maturity with Datamensio

  • IMT Mines Alès
  • Cetim
  • Aerospace Valley
  • Cap'Tronic
  • Chambre de commerce et d'industrie
  • Pôle SCS

An example

This could be your situation.

Take one company as an example: three sites, three spreadsheets, no shared answer.

01

Nobody can consolidate.

Nordhavn Industries, 2,400 people in Hamburg, Lyon and Porto. A client asks where the group stands. Each site answers in its own spreadsheet, with its own scales.

02

Three weeks, a single base.

One Directive 2009/147/EC of 30 November 2009 on the conservation of wild birds assessment launched across all three sites at once, from the managers’ interview notes. The framework was already written, its 10 themes and levels L1 to L5 too.

03

Two costs avoided before being committed.

A score of 53 out of 100, with the gap concentrated on three themes. The AI companion spotted that two actions duplicated those of another audit. The committee report took one sentence to request.

What it saved them

  • 3sites measured on the same base, instead of three questionnaires to reconcile
  • 2duplicate actions caught before the spend
  • 1committee report, with no manual rework

These figures are an example. They could be yours.

The standard imposes processes. Datamensio says where you stand.

01

The framework is already written

Themes, questions and levels L1 to L5, all written. You do not start from an empty spreadsheet.

02

The score lands the same day

Online, by self-assessment link or in interview. Theme by theme, comparable over time.

03

The gap becomes a costed plan

Every step up carries its action. The AI prioritises on expected effect, not on the order of the standard.

04

Progress can be demonstrated

Campaign after campaign, against your target and against your own past. That is what your board asks for.

The maturity scale

One level, the next, and the action that links the two.

This mechanism, a level, a higher level, and the action that links the two, is what turns a finding into a trajectory.

Are nesting periods taken into account before any intervention in areas likely to host birds (working faces, berms, stockpiles, wasteland)?

  1. N1

    No formal consideration. Interventions are scheduled solely according to operational needs.

  2. N2

    The principle is known and sometimes applied, on the site manager’s own initiative. No written calendar, no record of any check.

  3. N3

    A documented ecological calendar sets out sensitive periods and the areas concerned. It is circulated and generally followed, with occasional exceptions.

  4. N4

    Every intervention during a sensitive period is subject to a recorded prior check, with a documented decision to postpone or apply a mitigation measure, and is built into operating schedules.

  5. N5

    The calendar is reviewed every year based on field observations and ornithological monitoring results, with a history of revisions and cases handled.

Action to move from level 2 to level 3

Formalise an ecological calendar for each site, indicating sensitive areas and no-intervention periods, attach it to the phasing plan and present it at an operations meeting before the spring campaign.

« With Datamensio, we meet our objectives far more efficiently. The ERDF inspection services and our supervising ministry particularly appreciated an approach that gives them reliable data. »
Chambre de commerce et d'industrie

Director, CCI 94CCI Île-de-France

« We believe this is the most suitable solution to scale our transformation project and measure impact according to our needs. »
Interreg Danube Region

Maja SucekChief Operating Officer, Interreg Danube

Take your first measurement

What this framework covers

Directive 2009/147/EC, the codified version of the 1979 directive, protects all wild bird species found on European territory. It prohibits killing, capturing, destroying nests and eggs, and intentionally disturbing birds during the breeding season. It requires member states to classify the territories most suitable for the conservation of Annex I species and regularly occurring migratory birds as special protection areas. These areas form part of the Natura 2000 network and, for impact assessment purposes, fall under the Habitats Directive regime.

In practice, the difficulty is not knowing the text but keeping it in view when running operations. A quarry moves at the pace of working faces, stockpiles and backfilled areas, all temporary habitats that birds colonise quickly. The practical questions are always the same: does the stripping schedule account for nesting periods, or is it adjusted only when the works allow? Who checks for protected species before an intervention, and on what written record? Are the measures set out in the prefectoral order and the impact study followed through to site restoration, or do they stop at the authorisation file?

The context has tightened. European and national litigation over the destruction of protected species has intensified, and case law now holds that a derogation is assessed at individual level, not just population level. Many operators also confuse two distinct regimes: the strict protection of species, which applies everywhere and outside any designated area, and the Natura 2000 impact assessment, which is triggered for projects likely to affect a site. A site outside a special protection area remains fully subject to the directive’s prohibitions.

A compliance audit is binary: the requirement is met or it is not, and the finding holds as at the date of the check. The maturity assessment asks a different question: at what level of control does the practice sit, and what specific action moves it to the next level. An operator can be formally in order with its permits while having no repeatable pre-works verification process. It is this gap, invisible in a compliance report, that the maturity scale makes visible and turns into an action plan.

In Datamensio, the framework is ready to use and you keep full control of it. AI adjusts themes, questions and levels to your context, aggregates, hard rock, underground mining or wet quarrying, or builds a variant from your prefectoral orders, impact studies and ecological monitoring reports. Assessments are then rolled out across all sites to compare maturity levels between business units.

Reference standard: Directive 2009/147/EC of 30 November 2009 on the conservation of wild birds

The themes assessed

  • Knowledge of the framework and species concerned

    Identification of Annex I species and regularly occurring migratory birds present, monitoring of national protection lists, distinction between strict species protection and the Natura 2000 regime.

  • Site status with regard to special protection areas

    Mapping of boundaries, distance to designated areas, identification of ecological corridors, consideration of management plans.

  • Surveys and baseline conditions

    Survey protocols used, coverage of biological cycles, qualification of surveyors, data updated before each operating phase.

  • Impact assessment

    Triggering of the assessment, analysis of direct, indirect and cumulative effects, review of alternative solutions, alignment with the impact study.

  • Prevention of destruction and disturbance

    Ecological calendar and no-intervention periods, checks before stripping or felling, management of working faces and stockpiles, procedures in the event of a nesting discovery.

  • Protected species derogations

    Identification of cases requiring a derogation, justification of the absence of an alternative solution, avoid, reduce, compensate sequence, compliance with the conditions of the order.

  • Mitigation and compensation measures

    Definition of measures, land tenure and duration of commitments, ecological outcome indicators, monitoring of actual implementation.

  • Restoration and ecological management of the site

    Consideration of favourable habitats in redevelopment, creation of pioneer habitats, phasing coordinated with operations, future of the site after closure.

  • Skills, awareness and subcontracting

    Training of plant operators and site supervisors, ecological clauses in subcontracting agreements, checkpoints during safety inductions.

  • Traceability, reporting and stakeholder relations

    Recording of observations and interventions, annual monitoring reports, engagement with state agencies and conservation groups, monitoring committees.

A short version of the framework is available for the online self-assessment.

Frequently asked questions

Is the Birds Directive subject to certification?

No. It is a European directive transposed into national law, compliance with which is checked by state authorities and enforced by the courts. The assessment measures the maturity of your practices and prepares you for inspections or authorisation files, it does not issue any certificate.

What is the difference between this assessment and a regulatory compliance audit?

An audit checks compliance with requirements at a given date and concludes with a gap or a pass. The assessment places your practices on a progressive scale and identifies the action that moves you to the next level. The two complement each other: the assessment prepares the audit and feeds the action plan.

My site is not in a special protection area. Am I still concerned?

Yes. The prohibitions on destroying, capturing and disturbing birds and their nests apply across the whole territory, regardless of any zoning. Designation as a special protection area adds the impact assessment, it does not condition species protection.

How long does the assessment take?

The short version takes 20 to 30 minutes per site to complete. The full version, run collaboratively with the site manager, the ecologist and the permitting team, generally takes one to two weeks, most of the time being spent gathering orders and monitoring reports.

Can the framework be adapted to our activity?

Yes. Questions, levels and themes can be modified, and AI can build a variant from your prefectoral orders and impact studies. You can distinguish alluvial quarries, hard rock and underground mines within the same framework.

How can several sites be compared with one another?

Each site is assessed against the same framework, which makes theme scores directly comparable between business units and over time. A cross-site roadmap consolidates the audits to identify actions to be taken at group level rather than site by site.

Do I need ecological expertise to answer?

The questions cover organisation and management practices, not species identification. A QSE manager or site manager can answer them, and the collaborative mode lets you assign ecological questions to the ecologist or engineering firm.

Where is the data hosted?

In France, at OVH, with backup at Scaleway. No transfer outside the European Union. The AI models used can be selected, including from European providers.

Take your first measurement