EDIH, EEN, Interreg: the platform for European programmes.Find out more

Analyses

DMAT 2.0: EDIH Hubs to Run Two Maturity Assessments in Parallel

On October 6, 2026, the EDIH network published the materials from its welcome event held on September 18 for new and existing hubs. They announce that the new digital maturity assessment tool, DMAT2, is in final testing and must not yet be used with companies. For several months, each hub will therefore track two populations of companies assessed under two versions of the framework.

9 October 2026 · 4 min read

On October 6, 2026, the EDIH network published the materials from its welcome event for new and existing hubs. The event took place on September 18, 2026, and featured two checklists covering access and roles, catalog profile, DMAT, indicator reporting, and available support. The first checklist targets hubs joining the network, the second targets hubs already in operation.

The most structurally important point for program management concerns the digital maturity assessment tool. The materials state that DMAT2 is in final testing, that it will become available in the coming weeks, and that it must not be used with companies before its official launch. The hub catalog itself has been redesigned to support the transition from EDIH 1.0 to EDIH 2.0.

In other words: the switch has been announced, loosely dated, and comes with a freeze instruction. This is exactly the setup that creates gaps in measurement series if nobody plans ahead.

From Six Dimensions to Five: What the Framework Changes

The Commission’s presentation on the network’s common tools describes the revision. DMAT 2.0 moves from six to five dimensions, tightens the assessment framework, places digital strategy and AI at the center of the model, and aligns with the Eurostat ICT survey to enable comparability at the European level.

As a reminder, the first tool spreads the score across six areas: digital strategy, digital maturity, human-centric digitalization, data management, automation and artificial intelligence, and green digitalization. Moving to five dimensions is therefore not a simple cosmetic simplification. Contributions are redistributed, weightings change, and the overall score of a company assessed under version 2 cannot be read the same way as one assessed under version 1.

This is the point to watch. A score only has relative value: relative to a framework, a population, and a date. Changing the framework without documenting it turns a methodological shift into an apparent performance shift.

Two Company Populations Within the Same Program

The announced rule is easy to state and heavy to manage in practice: companies already assessed with the first tool stay with it for their follow-up assessments. On the platform side, navigation stays identical, and the system automatically selects the applicable version.

Each hub will therefore manage two cohorts in parallel. On one side, companies that entered before the switch, tracked at T1 and T2 under the old framework. On the other, companies onboarded after the launch, assessed from the start under the new one. Both feed into the same reporting, the same catalog, and the same result commitments toward the Commission.

The consequences are concrete. The average maturity of a portfolio mixing both versions means nothing. Year-over-year aggregate progress means just as little if the composition of the base changes. And advisors conducting feedback sessions will have to handle two different reading grids without mixing them up in front of the company.

What a Hub Can Organize Now

Four workstreams can be launched without waiting for the exact release date.

Take inventory. List companies already assessed, the date of their initial diagnosis, the deadline for their follow-up assessment, and the version applied. This inventory becomes the reading key for all upcoming reporting.

Freeze properly. The instruction is not to use the new tool with companies before the official launch. This means informing advisors and consortium partners, and checking that no assessment is scheduled on an unpublished version.

Document the mapping. As soon as the final questionnaire is available, build the correspondence table between the six old dimensions and the five new ones, question by question. This document determines the ability to rebuild usable series and to explain a score gap to a business unit or a funder.

Rework the feedback report. An assessment report should now state the version used on its first page. The resulting action plan is better anchored to the dimensions themselves rather than the overall score, which is the part most sensitive to a framework change.

Going Further

The coexistence of two frameworks is not unique to the EDIH network. Any organization that revises its maturity model mid-program ends up with populations assessed differently and roadmaps built on different bases. The answer is methodological before it is technical: version the framework, timestamp every assessment, and keep raw answers, not just scores.

On this topic, useful Datamensio resources cover running a multi-entity diagnosis and comparing scores over time. The links below point to our work on European programmes, measuring the impact of a network, and building maturity frameworks.